Ricoh Container Stacker Manual do Utilizador Página 20

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 49
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 19
Container Stacker Installation Instructions 1-15
9. Close Front Cover R to allow you to see the gap between the Printer and
Container Stacker. Using the leveling bolts, adjust the height of the Container
Stacker until the Container Stacker frame projection is level with the Printer
Paper Guide projection. Adjust the horizontal level of the Container Stacker by
placing a level on the stacker frame in the three locations shown below. Tighten
the screws completely.
10. Verify the gap at A, B, C, and D is nearly equal.
Stacker Frame
Printer Paper Guide
Level
Front Cover L
Projection
Projection
Same Height
Leveling Bolts
Connection Part Details
A
B
C
D
Adjust the parallel gap
Vista de página 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 48 49

Comentários a estes Manuais

Sem comentários